Intelligence · Gulf Capital Tracker

~$80 BILLION FROM THE GULF, FLOWING INTO NORTH AMERICAN AI INFRASTRUCTURE

Saudi PIF (HUMAIN), Abu Dhabi sovereign capital (MGX, Mubadala, G42), and Saudi state holdings (Vision Invest / DataVolt) have collectively committed $70–80B to data center infrastructure with material US exposure. The MGX/AIP/GIP acquisition of Aligned Data Centers alone is the largest DC transaction in history at $40B. This is Konative's tracker on what they're building, where, and with whom.

Discuss a Site for a Gulf-Funded Build →How We Score Sites
$40B
MGX/AIP/GIP × Aligned acquisition
$20B
DataVolt × Supermicro US commitment
$10B
AMD × HUMAIN compute partnership
5 GW
Stargate UAE total capacity
6 GW
HUMAIN 2034 installed target
500 MW
HUMAIN/AMD US capacity (5 yr)

Entities Konative Tracks

FOUR PLAYS, FOUR DIFFERENT US POSTURES

HUMAIN

PIF (Saudi Public Investment Fund) · Launched May 2025

C$10B over 5 years

AMD PARTNERSHIP — 500 MW BUILD ACROSS SAUDI + US

HUMAIN is the centerpiece of PIF's AI infrastructure thesis. Targeting 1.9 GW installed by 2030, 6 GW by 2034. AMD partnership commits up to US$10B over five years to deploy 500 MW of AI compute across Saudi Arabia AND the United States. Blackstone JV adds another US$3B. Already secured up to US$1.2B in additional facility financing.

Active builds + commitments
AMD-powered AI compute
Saudi Arabia + United States
500 MW
Active build, 5-year commitment
stc / centre3 JV
Saudi Arabia
Up to 1 GW AI workloads
JV announced; build underway
xAI Saudi DC
Saudi Arabia
500 MW
Announced with Elon Musk's xAI
Al Moammar (MIS) build
Saudi Arabia
TBD
Design + build contract awarded 2025
Konative angle

HUMAIN US site selection is the single highest-leverage RFP in the Gulf-to-NA pipeline. AMD's NA data center footprint will need power, water, and land. Konative covers the markets where 500 MW will land.

MGX × AIP × BLACKROCK GIP

Mubadala (Abu Dhabi) + G42 · MGX launched March 2024

US$40B

ALIGNED DATA CENTERS ACQUISITION — LARGEST DC DEAL EVER

In October 2025, MGX joined BlackRock's GIP and AI Infrastructure Partners (AIP) to acquire Aligned Data Centers from Macquarie Asset Management for US$40B. Deal closes H1 2026. Aligned operates 50+ campuses across North and Latin America — instantly making this consortium one of the largest hyperscale operators on the continent.

Active builds + commitments
Aligned Data Centers (Cornerstone)
North + Latin America (50+ sites)
Multi-GW operating + pipeline
Acquisition closing H1 2026
New site pipeline
NA expansion
TBD — multi-GW commitment
Aligned's existing land bank + new acquisitions
Konative angle

Aligned's under-AIP-management pipeline = the largest single source of Gulf-funded DC capacity expansion in NA. New land near Aligned's existing campuses (Phoenix, Dallas, Salt Lake City, Ashburn, Chicago) becomes immediately strategic. Konative is sourcing landholders in those markets right now.

G42 / STARGATE UAE

Abu Dhabi sovereign + OpenAI + Oracle + NVIDIA + SoftBank + Cisco · Announced May 2025

5 GW total / 200 MW Q3 2026

LARGEST AI CAMPUS OUTSIDE THE US

Stargate UAE is a 5 GW AI infrastructure cluster being built outside Abu Dhabi. First phase (200 MW) goes live Q3 2026. The full 1 GW campus runs on nuclear, solar, and natural gas. The UAE-US AI Acceleration Partnership specifically allows reciprocal US compute capacity buildouts under sovereign-AI security frameworks — meaning G42 builds in the US too.

Active builds + commitments
Stargate UAE Phase 1
Abu Dhabi
200 MW
Q3 2026 RFS
Stargate UAE full campus
Abu Dhabi (10 sq mi)
5 GW
Multi-year buildout
G42 US footprint expansion
United States (TBD)
TBD
Underway via UAE-US AI Acceleration Partnership
Konative angle

G42's US site selection follows the Stargate template: nuclear-adjacent or large gas-fired sites with co-located substations. Watch for site announcements in Texas (ERCOT), Pennsylvania (PJM), and the Mountain West (WECC) — all markets in Konative's coverage.

DATAVOLT

Vision Invest (Saudi state holding) · Founded 2023

US$20B US commitment

SUPERMICRO PARTNERSHIP — $20B US BUILDOUT

DataVolt + Supermicro announced a US$20B joint deal during the Trump administration to deliver computing power and supporting infrastructure for DataVolt data centers across the United States and Saudi Arabia. Saudi sites go live Q2 2026. NEOM's Oxagon DC is a US$5B 1.5 GW net-zero AI factory campus DataVolt is anchoring.

Active builds + commitments
DataVolt US sites
United States (multiple sites)
Multi-GW pipeline
Phase 1 site selection underway
NEOM Oxagon AI factory
NEOM, Saudi Arabia
1.5 GW
Phase 1 build under DataVolt + NEOM JV
HUMAIN multi-GW JV
Saudi Arabia
Multi-GW
Joint development announced
Konative angle

DataVolt is the most modular-friendly of the Gulf operators — they explicitly underwrite to net-zero designs and integrated energy. They are exactly the build partner Konative's thesis was designed for. NA site selection is active.

Activity Timeline

THE GULF-TO-NA AI INFRASTRUCTURE TIMELINE

Mar 2024launchMGX launched by Mubadala + G42
May 2025launchHUMAIN launched under PIF
May 2025launchStargate UAE announced (G42 + OpenAI + Oracle + NVIDIA + SoftBank + Cisco)
Aug 2025capitalHUMAIN secures up to $1.2B additional facility financing
Oct 2025m&aMGX + GIP + AIP $40B acquisition of Aligned Data Centers announced
Q4 2025buildHUMAIN first 50 MW operational target
Q2 2026buildDataVolt Saudi sites go live
H1 2026m&aMGX/AIP/GIP × Aligned acquisition closes — Aligned becomes Gulf-controlled hyperscale platform
Q3 2026buildStargate UAE Phase 1 (200 MW) goes live
2026 ongoingbuildHUMAIN +50 MW per quarter through 2026
2030milestoneHUMAIN 1.9 GW installed target
2034milestoneHUMAIN 6 GW installed target

WEEKLY GULF CAPITAL TRACKER → YOUR INBOX

One short email per week: new commitments, new sites, capital movements, and what they mean for North American DC site selection. No filler.

Subscribe →Book a Call

Last updated: April 2026. Tracker refreshed weekly via Konative's Saudi feed automation. How we score the sites these dollars are chasing →